Excavation

Schematic Phase

• Assist in selection of project team • Review building program; define project scope and objectives

Site Evaluation

• Analyze the property line documentation. Cross check with the physical location the property line • Analyze Soil Reports and identify hidden costs • Stake the site, review site status • Identify flooding or storm drain concerns • Verify zoning and environmental restrictions

Cost Management/Estimating

• Prepare value analysis reports for job costs and materials. • Perform construct-ability reviews and recommend cost effective alternatives • Determine bonding requirements

Bidding and Procurement Phase

• Conduct walk through and on site visits • Mobilize field staff • Attend pre-bid conferences

Contact Us

qoute

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.